The project “Extension of Kabul Water Supply System” is conceived as a multi-staged project for Kabul, based on the “locally and readily available” water resources. In the frame of the extension of water supply system Kabul (Kabul II) in Logar II (Shiwaki) a pumping station will be constructed. The pumping station will pump up the water, coming from the well fields, to the reservoirs.
This was a unique water supply system to the date and the geotechnical investigation and laboratory testing of the materials has been carried out by Truth Land Engineering Services on December 2017.