Morgue
Project Name: KABUL NATIONAL MILITARY HOSPITAL CONSOLIDATED MORGUE & VISITATION CENTER (KNMH-M&VC)
Contract Reference #: W5J9JE18C0007
Client: USACE-TAA
Prime Contractor: MACRO VANTAGE LEVANT (MVL) (CAGE: STG58)
Subcontractor: Truth Land Engineering Services
Commencement Date: June 7, 2018
Completion Date: March 08, 2019
Scope of Service:
The project consists of the design and construction of a new Consolidated Morgue and Visitation Center (Morgue) and associated site work, utilities and infrastructure. The facility will be located at Kabul National Military Hospital in Kabul Afghanistan (KNMH-A), Kabul Province, Afghanistan.
Truth Land engineering service is proud to be a part of the team to do the following duties during the project:
• Conducted topographic survey of locations for the design of the project area site such as drainage of the area the existing utility tunnel and other infrastructures.
• Carried out utility survey (waste water, water supplies, electrical, communications) of the area. This utility survey covered the general area of construction phase and answered all the requirements of design stage.
• Preformed a general site assessment which include all the electrical, water supplies, waste water and communication systems in the field.
April
07
2019
11,210Comments