April 07 2019 16,828Comments

Salang

Summarized project description:
Project Name: Topographic Survey Works for the Salang Pass & Tunnel Project
Contract Reference #: NPA/MPW/96/Cs/1560/QBS
Client: Ministry of Public Work
Prime Contractor: Technologists Inc.
Sub-Contractor: Truth Land Engineering Services
Commencement Date: Aug 07, 2018
Completion Date: Feb 02, 2019

Introduction:
The Salang Pass is a 85 kilometers long high way started from Jabul Saraj and ended to Khenjan district which is divided into three mention parts:
Northern Salang Pass, Middle (Critical) Salang Pass including Salang Tunnel and Northern Salang Pass.
The Middle (Critical) Salang Pass including Salang Tunnel has 30km length and include 2.7km long tunnel located at the Salang Pass in the Hindu Kush mountains, between the Parwan and Baghlan provinces of Afghanistan and14 galleries along the Middle Salang Pass.
It was completed by the Soviet Union in 1964 and has been used to connect the northern Afghan cities with the capital of Kabul. The tunnel is currently being repaired and improved. Between seven and ten thousand vehicles pass through the tunnel each day.

Scope of work:
Salang Pass and Tunnel awarded by ministry of public works in the aim of rehabilitation and repairing of the Salang pass and Tunnel.
The Middle (Critical) Salang Pass was taken by Technologists Inc. as Prime Contractor.
Truth Land Engineering Services Is proud to be a part as Sub-Contractor to perform topographical survey works, utility survey works and Tunnel inspection reports of this national project.
The Middle (Critical) Salang Pass including 14 galleries, 80 culverts, retaining wall, protection wall and Salang main Tunnel.
Finally, Truth Land Engineering service complete all survey works with success on Jan,2019.